TC3 – Woking Technology Centre
|
|
|
|
|
|
|
Physical Features
- Building size – 200,000 sq ft
- Data centre – 24,219 sq ft
- 24/7 SunGard Control Centre providing on-site 24/7 technical staff.
Power
- Two separate mains feeds from the utility provider
- Minimum N+1 redundancy of power to the data centre
- Diverse A and B supplies to every cabinet
- 8 UPS units spread across
- 2 locations for resilience
- 5 diesel generators (4 are required to run the data centre at full load)
- 72 hours of fuel stored on site for generators
- Emergency provisions in place for extra fuel.
Environment
- Minimum N+1 redundancy on chilled water cooling system
- Temperature in data centre space maintained at (22ºC +/- 2ºC)
- Humidity maintained at 50% (+/- 10%)
- A & B diverse chilled water supply with automatic switchover
- Analogue addressable fire detection system in all areas
- Early warning VESDA system installed in all plant and data centre areas
- Gas protection in the data centre.
Communications
- Access to multiple communications providers delivered from SunGard managed racks
- Multiple access building entry points for diverse routing of communications
- Tri-angulated connectivity to multiple SunGard data centres giving greater diversity and resilience of communications providers.
Physical Security
- 24/7 Security guards
- External and internal CCTV cameras digital recording to disk
- Proximity access control system
- Secure managed loading bay
- Intruder and door alarms with external infra-red detectors
- UK Government SEAP 3 level high security fence surrounds the site
- Vehicle entrance to the site is controlled by an electronic sliding security gate supported by anti-ram barriers.
|
|
|
|
|
|
|
|
|
|
|